PRELOAD PRELOAD
Our Blog

Construction of the Humber College Building F Health Science Addition & Renovation is well underway

Construction of the Humber College Building F Health Science Addition & Renovation is well underway.  This 38,000 sq. ft. project is an addition on top of an existing two-storey building, providing new lab space on the fourth floor, and classrooms on the third floor.  Informal student lounges and causal break-out study spaces on both floors overlook the beautiful Humber Arboretum.

The re-cladding of the existing building is made of materials that are neutral in colour, with a combination of fibre-reinforced cement panels, metal cladding, glass, and exposed steel structure to create a rich palette.  A new glazed addition will highlight the new steel truss structure.  Inspired by the structural geometry of the existing structure, the glazed addition will be cladded with curtain wall with an intricate triangular geometric frit.

Construction is scheduled to be completed by May of 2015.

Interested in real-time updates?  Click the link below to view Humber College‚Äôs live webcam of the construction process:

http://www.ucitonline.com/humberf/

Archive


© 2010 Montgomery Sisam Architects Inc. | Privacy Policy